Research · Proposal · Updated Oct 5, 2026
Lanes on the 12 streets where buses lose the most time, and have little or no lane, would save riders about 180,000 hours a year. At the value USDOT puts on travel time, that’s about $3.5 million a year. Each mile of lane takes about 20 seconds off a bus trip, so a half-hour ride gets about a minute shorter.
Rider-hours saved each weekday if the blocks of each street without a lane got one, at the typical gain of 3.3%. Flatbush Av and Broadway save the most in all. Per mile of new lane, Madison Av is far ahead: 17 routes share its blocks.
Under each street: the share of its route-miles already on a lane, and the miles of street that would need one. Weekdays, 7 am to 7 pm. Hover or tap a street for the details.
The fewer the streets, the more each mile of lane gives back; the more streets, the bigger the total. How well the lanes work matters as much as how many there are.
| Version | Lane-miles | Rider-hours a weekday | Rider-hours a year | Riders’ time a year | Bus service a year | Per lane-mile |
|---|
Buses ran 3.3% faster on 53 stretches that got a new lane from 2023 to 2025 than on similar stretches without one, over the same months (95% interval 1.9% to 4.7%). Before the lanes opened, the two groups moved together; the gap opens the month the lane does and holds for a year. Dropping any one corridor leaves the answer between 2.7% and 3.7%, though single streets range from 1.4% (East Gun Hill Rd) to 8% (East 96 St). It is the same kind of test as on the congestion pricing evaluation: compare what changed with what didn’t, over the same months.
Bus speed on stretches that got a new lane, minus matched stretches with no lane, by months from the lane’s opening. Each period is measured against the six months before opening. Weekdays, 6 am to 8 pm; 53 stretches on 23 routes.
For each street, we take the time buses spend on it each weekday, keep the part on blocks with no bus lane, and cut it by the speed gain new lanes have delivered. Then we turn bus-hours into riders’ hours and dollars.
Caveats: the 3.3% comes mostly from offset lanes in Manhattan, Queens and the Bronx; few Brooklyn lanes were in the study, and none were busways. A new lane comes with cameras, signal changes and curb rules, so this is the effect of the package, not paint alone. We use 14 riders aboard a bus, a citywide figure; the street table’s riders are boardings on every route that touches a street, not riders on that street, so they can’t be used here. This counts weekdays from 7 am to 7 pm only, and buses only: not weekends, not riders drawn by faster trips, and not what lanes do to car traffic. Bus speeds on these streets are averages over six months, and each street’s gain will differ from the average. This is an estimate for planning, not a forecast for any one street.